Objectives:
- To discusses on the result, analysis and performances that are encounter in the final result.
- To evaluate the effectiveness and ensure whether it had meed the outlined objectives successfully.
- To compare a result from three different methods.
Content / Procedure:
- Make a comparison table between the three methods which is prototype testing, calculation and simulation.
- Make an analysis for inverter circuit.
- Do a hydroelectric prototype troubleshooting.
- Check the output current either the load can be powered or not.
Result and Analysis:
- A power inverter is a device that converts DC 9direct Current) power into AC (Alternating Current) power.
- The output is 230 VAC, 50 Hz. the circuit test was done using a Multimeter.
- The picture and result for hydroelectric prototype was shown below:
SUBJECT
|
VALUE
|
1. Input Voltage from
motor (A):
|
12.23
V
|
2. Output Voltage
from inverter (A):
|
221.5
V
|
3. Input Current from motor (A):
|
18
A
|
4. Output Current
from inverter (A):
|
4.5
A
|
5. Input Power from
motor (W):
|
220.14
W
|
6. Output Power from
inverter (W):
|
996.75
W
|
- Based on the the inverter circuit result, the overall result can be considered good and on the track.
- The current output produced by hydroelectric generator is suitable to be use by common electrical and electronic equipment such as Laptop. Charger Hand Phone, Water Heater and so on.
- The testing result is been compared with another two methods; which is simulation and calculation result.
Subject
|
Circuit
Test
|
Simulation
|
Errors
|
Calculation
|
Errors
|
Input
Voltage
|
12.23 V
|
11.91 V
|
2.6 %
|
12 V
|
1.9 %
|
Output
Voltage
|
221.5 V
|
239.54 V
|
8.1 %
|
240 V
|
8.4 %
|
Current
Output
|
4.5 A
|
4.17 A
|
8.0 %
|
4.17 A
|
8.0 %
|
- Based on the table, it clearly shown the errors of all result that have been used in this project.
- The result get for the prototype hydroelectric generator is considerably accurate and precise because of the lower errors percentage.
Conclusions
- The result got from a simulations and calculation is accurate and ideal because both method was done by following the theory.
- The practical result was been expected have some errors based on many consequences can happen like human error and etc.
- The hydroelectric generator performance is good and shown the right characteristic according to objectives.
Kenali Abdul Syafiq :
Mr.TN_SkY juga adalah penulis untuk blog STORY PONDOK KECIL dan INFO HARIMAU MALAYA. Birdies boleh mengikuti SkY di Twitter atau di Facebook. Jika birdies mempunyai soalan, boleh like fanpage pondok kecil ye, Pondok Kecil Crew.
No comments:
Post a Comment