Thursday, March 8, 2012

WEEK 7: BUY MECHANICAL MATERIAL


Objectives: 
  • To find a suitable mechanical parts.
  • To compare the specification of the material.
  • To justify the right material that meet the right cost.
Content / Procedure: 
  • Make a research about items that need to be used.
  • Go to Jalan Pasar and Kepong to find the the material.
  • Do a component test.
  • Make an analyse about hydroelectric operation systems.
Result and Analysis:
  • I'm done a few research about operation and simpler systems of hydroelectric in market. Most of it is using the bigger turbine in order to produce a higher electricity.
  • So, the comparison between common hydro systems that usually use in village or small hydro has been used as reference.
  • A few important component has been quickly such as Alternator, Shaft and bearing to make a configuration of the systems as soon as possible. the receipt for buying this component are been shown below:
RECEIPT: PURCHASE SHAFT
RECEIPT: PURCHASE ALTERNATOR
RECEIPT: PURCHASE BEARING
  • Most of the mechanical material that have been purchased is on generator part. 
  • The configuration of the component are been done at the workshop.

Conclusions
  • The critical component are been purchased.
  • The mechanical cost must be control wisely.
  • All the component must be checked and installed properly.